Public Housing


Michigan City Housing Authority

Customer’s Contact Information:

Sharon Hutton, Executive Director

Total Project Cost and Projected/Guaranteed Annual Savings:

Project Cost: $1,104,854

Projected/Guaranteed Annual Savings: $110,600

Financed Amount: $1,104,854

Rebates: Approximately $20,000

Type of Contract:

15-year contract and financing term, guaranteed savings

Energy Conservation Measures Implemented:

We developed this EPC for a PHA 185 units (rowhomes, quads, and scattered sites) Services included an investment grade energy audit, design A&E, construction management, savings guarantee, and measurement of savings. ECMs installed included water conservation measures, interior and exterior LED energy-efficient lighting, boiler replacement, and furnace replacements.


Erie Metropolitan Housing Authority- Phase II

Customer’s Contact Information:

Mr. Ralph Chamberlain, Executive Director

Total Project Cost and Projected Annual Savings:

Project Cost: $1,355,520

Projected/Guaranteed Annual Savings: $193,061

Financed Amount: $2,109,520

Rebates: Approximately: $89,000

Type of Contract:

Phase II – 15-year contract and financing term, guaranteed savings, insured guarantee.

Energy Conservation Measures Implemented:

Energy Conservation Measures Implemented: We developed this Phase II EPC for EMHA ( 227 units (1 high-rise with 134 units and 93 scattered sites). Services included an investment grade energy audit, project development, savings guarantee, design, construction/implementation, and measurement of savings. ECMs to be installed include water conservation measures, interior and exterior LED lighting, combination boilers, tankless hot water heaters, furnaces, commercial dishwasher, 3-ton RTU, 15-ton RTUs, 5-ton split system, exhaust fans, occupancy sensors, and windows.


St. Joseph Housing Commission

Customer’s Contact Information:

Mrs. Nicol Brown, Executive Director

Total Contract Cost and Projected Annual Savings:

Project Cost: $183,000

Annual Savings: $22,528

Financed Amount: $183,000

Type of Contract:

10-year Tax-exempt Lease Agreement.

Energy Conservation Measures Implemented:

We developed this EPC for a small PHA with one hundred and seven units (107) in a single high-rise. Services include an investment-grade energy audit, project development, savings guarantee, design, construction/implementation, and measurement of savings. ECMs installed included water conservation measures, energy-efficient lighting, programmable thermostats, installing a laundry room automatic damper, vending machine energy manager, MUA unit premium efficient motor, and building envelope improvements.


Traverse City Housing Commission

Customer’s Contact Information:

Anthony Lentych, Executive Director

Total Contract Cost and Projected Annual Savings:

Project Cost: $284,860

Projected/Guaranteed Savings: $27,760

Actual Savings generated in the first year: $34,795

Financed Amount: $284,860

Rebates: $10,200

Type of Contract:

10-year Tax-exempt Lease Agreement.

Energy Conservation Measures Implemented:

We developed this EPC for a small PHA (136 units, 1 high-rise and 20 townhouse units.) Services include investment grade energy audit, project development, savings guarantee, design, construction/ implementation, and measurement of savings. ECMs to be installed include water conservation measures, energy-efficient lighting, common area water heaters, limiting thermostats, hot water pipe insulation, and building envelope improvements to cut down the excessive outside air infiltration at the family site units.

“We would never be able to accomplish energy upgrades, all at one time, utilizing Capital Funds; with an EPC having a savings guarantee it didn’t take much additional thought to look into the possibility of entering into an EPC with Wind, Water and Energy Conservation and getting the additional funding we needed to get things done.”
- Ilah Honson, Traverse City Housing Commission

Titusville Housing Authority

Customer’s Contact Information:

Ms. Alexa Vroman, Executive Director

Total Project Cost and Projected/Guaranteed Annual Savings:

Project Cost: $375,000

Projected/Guaranteed Annual Savings: $50,539

Actual Savings generated in the first year: $64,013

Financed Amount: $375,000

Rebates: Approximately $3,000

Type of Contract:

10-year Tax-exempt Lease Agreement.

Energy Conservation Measures Implemented:

We developed this EPC for a small PHA (150 units, 1 high-rise and 3 family sites of townhomes/apartment units). Services included an investment grade energy audit, project development, savings guarantee, design, construction/implementation, and measurement of savings. ECMs to be installed include an energy recovery ventilator to recapture waste heat and to improve indoor air quality, water conservation measures, energy-efficient lighting, and windows.

“I would recommend Wind, Water and Energy Conservation to implement an Energy Performance Contract.”
- Billie Brown, Titusville Housing Authority