Churches / Schools


Bishop McLaughlin Catholic High School

Bishop McLaughlin Contact Information:

Camille Jowanna, Principal

Roman Catholic Diocese Contact Information:

Richard Kolhoff, Director of Construction, RCDSP

Total Contract Cost and Estimated Annual Savings:

Project Cost: $1,227,400

Projected Savings: $204,650/Year

Estimated Payback: 6.2 years

Type of Contract:

10-year contract term, guaranteed savings

Scope of Services:

WWEC developed this EEP with the help of BMCHS management and staff. This is an example of an EEP applied to a private institution utilizing the same basic principles of an EPC. Services rendered included project development, design, savings guarantee, construction, and measurement of savings. Installed ECMs included installing low flow sink aerators in the bathroom and kitchen areas, supplementing the existing natural gas boiler with pre-heated water from Zero Energy, energy-efficient lighting, re-design of HVAC systems for Gym and Locker Room Areas, replacement of all other existing HVAC systems, installation of HVAC controls with centralized WiFi accessibility, and upgrading the existing Locker Room ventilation with high efficiency motors and variable speed controls.

“I highly recommend Andrew Overmyer and the entire Wind, Water, Energy team. They have been very professional during the energy conversion project at Bishop McLaughlin Catholic High School. They have been extremely responsive to our facility’s needs and we have been kept up-to-date and informed throughout the entire process. Communication and professionalism have been their standard and we are very pleased with their services.”
Camille Jowanna, BMCHS Principal



Most Holy Redeemer Catholic Church for Legacy Preparatory School

Customer’s Contact Information:

Father Allan Tupa

Total Project Cost and Projected Savings:

Project Cost: $797,365

Projected Annual Savings: $107,857

Type of Contract:

Energy Efficiency Program (EEP)

Energy Conservation Measures Implemented:

We developed this EEP and ECMs installed included the replacement of nineteen (19) existing HVAC systems; replacing three (3) previously replaced in August 2016; installing new HVAC and lighting controls; replacing interior and exterior lighting; water fixture repairs and hot water recovery; roof replacement (roof, gutters, downspouts); and insulation and weatherization.



Scope of Work:

  • Remove and properly dispose of the eighty-four (84) existing 250W Halogen bulbs and existing glass lens
  • Replace with eighty-four (84) new 28W LED dimmable bulbs with base converter (White, Par38, 2400 lumens, 3000 K color, 25 degrees angle)
  • Remove and properly dispose of eighteen (18) existing 64W directional flood light bulbs
  • Replace with eighteen (18) new 17W LED dimmable bulbs with base converter (White, Par38, 1200 lumens, 3000 K color, 25 degrees angle)
  • Remove and properly dispose of ten (10) existing 32W fluorescent bulb and convert fixture for 4’ linear fixtures
  • Replace with ten (10) new 15W LED replacement linear bulbs (1800 lumens, 3500 K color converted with no ballast fixture)
  • Remove and properly dispose of 60W incandescent light bulbs in the five (5) round ceiling fixtures and the six (6) pendant lights in the chapel area
  • Replace five (5) round ceiling fixtures and six (6) pendant lights in the chapel area with 10W LED light bulbs
  • Convert linear fixtures and to inspect ballast in can lights

St. Petersburg Catholic High School

Project 1 – Gym, Locker Room & Classrooms

Customer Contact Information:

Richard Kolhoff, Director of Construction for RCDST

Total Project Cost:

Total Contract Cost and Projected Annual Savings:

Project Cost: $268,500

Projected Savings: $33,800/Year

Estimated Payback: 7.26 years

Actual savings generated in first year: $43,766

Type of Contract:

7.26-year financing contract term.

Scope of Services:

WWEC developed this EEP with the help of the SPCHS management and staff. This is an example of an EEP applied to a private institution utilizing the same basic principles of an EPC. Services rendered included project development, financing research, savings guarantee, design, construction, and measurement of savings. Installed ECMs included water conservation measures, energy-efficient lighting, insulation, high efficiency heat pumps, DHW controls, and solar DHW heater.

“A very reliable company with outstanding performance”
Former SPCHS Principal Father Michael Conway

St. Petersburg Catholic High School

Project 2 – Science Building HVAC

Evaluation and Replacement

Customer Contact Information:

Richard Kolhoff, Director of Construction for RCDST

Total Contract Cost:

Project Cost: $48,200

Type of Contract:

Building Analysis and Construction Agreement

Scope of Services:

WWEC performed an evaluation on the existing 30-Ton HVAC Rooftop HVAC Unit (RTU) for the Science Building at SPCHS. Work included an evaluation of existing building loads, building air infiltration test, fresh air / ventilation requirements, equipment sizing, energy efficient alternatives, and HVAC equipment selection. WWEC’S evaluation revealed existing system was oversized and did not provide adequate fresh air as per current Florida Mechanical Codes. The “rightsizing” of the existing HVAC system allowed SPCHS to upgrade to Carrier 25-Ton Rooftop system with 2-Stage Cooling, motorized CO2 demand ventilation damper (to provided adequate fresh air), a “Humid-MiZer” adaptive dehumidification system for outside air, and an “E-Coated” corrosion protection for the condensing coils. The upgraded energy efficient and sustainable features were included on the “rightsized” 25-Ton RTU at a comparable price of the 30-Ton alternatives./p>